| Cantidad Mínima De Pedido: | 1 |
| Precio: | Negociable |
| Período De Entrega: | 7-10 días laborables |
| Método De Pago: | T/T |
| Capacidad De Suministro: | 5000 unidades por año |
1. Flat rack is better for bigger construction equipmennt and no need to dismantle.
2.Container is cheapest and fast.
3.Bulk cargo ship is better for bigger construction equipment.
4. Ro-Ro ship is faster and good for every kinds machine
| Cantidad Mínima De Pedido: | 1 |
| Precio: | Negociable |
| Período De Entrega: | 7-10 días laborables |
| Método De Pago: | T/T |
| Capacidad De Suministro: | 5000 unidades por año |
1. Flat rack is better for bigger construction equipmennt and no need to dismantle.
2.Container is cheapest and fast.
3.Bulk cargo ship is better for bigger construction equipment.
4. Ro-Ro ship is faster and good for every kinds machine